Contact ACE   |  Train Status   |  Search    

Infinite Menus, Copyright 2006, OpenCube Inc. All Rights Reserved.

Working With ACE » Current Study Presentations & Feedback
ACE Corridor Analysis: Stockton

What is the ACE Corridor Study?

» 9/7/06 - ACE Rail Corridor Analysis: Progress Update MS Power Point Presentation 5Mb

As the ACE service approaches the end of its first decade of commuter rail service to the San Joaquin Valley, Tri-Valley and Silicon Valley, the Regional Rail Commission is keenly aware of the need to expand the existing ACE service and to improve the quality of the service to ACE’s passengers. To this end the Commission has appointed consultants to undertake a study during Summer/Fall of 2006 with three key deliverables:

  1. A short term (i.e. 1-5 years) Action Plan to improve and increase ACE Service between Stockton and San Jose.
     
  2. A longer term (i.e. 6-10 years) Action Plan to improve and increase ACE Service between Stockton and San Jose.
     
  3. An Action Plan detailing the steps that will need to be taken to improve the ACE-BART connection at Pleasanton.