ACE Rail - Altamont Corridor Express
Log in
Search for:
youtube
facebook
twitter
instagram
rss
email
Alerts
Other ways to connect
ACE Rail:
Menu
FOR YOU
GETTING YOU THERE
TICKETS
ABOUT
CONTACT
Your browser is out of date. Please download a more recent browser for secure online navigation.
View list of browsers that are supported
.
ACEforward Draft Environmental Impact Report
ACEforward Factsheet
Public Meetings
Contact/Sign up
Archive
ACEforward Notice of Public Review Period Extension
ACEforward_Notice of Public Review Period Extension
ACEforward Notice of Availability (NOA)
Notice of Availability
ACE
forward
Draft Environmental Impact Report (DEIR)
(Figures are located at the end of the sections)
Cover Page
Title Page
Executive Summary
Executive Summary (Spanish Version)
Table of Contents
Introduction
Description of Near-Term Improvements
/
Part 2
/
Part 3
(with figures)
Description of Longer-Term Improvements
/
Part 2
/
Part 3
(with figures)
Impact Analysis
Aesthetics
Agricultural Resources
Air Quality
Biological Resources
/
Part 2
/
Part 3
/
Part 4
(with figures)
Cultural Resources
Energy
Geology and Soils
Greenhouse Gas Emissions
Hazardous Materials
Hydrology and Water Quality
/
Part 2
/
Part 3
(with figures)
Land Use and Planning
Noise and Vibration
Population and Housing
Public Services
Recreation
Safety and Security
Transportation and Traffic
/
Part 2
/
Part 3
/
Part 4
(with figures) /
Part 5
(with figures) /
Part 6
(with figures) /
Part 7
(with figures)
Utilities and Service Systems
Other CEQA-Required Analysis
No Project Alternative and Alternatives Considered and Dismissed
Comparison of Alternatives
Public Agency Involvement
List of Preparers
References
Back Cover
DEIR Appendix
Appendix A - NOP and Scoping Summary Report
Appendix B - Supplemental NOP and Supplemental Scoping Summary Report
Appendix C - ACE
forward
Environmental Footprint
Appendix D-1 – Volume 1A: Track Alignment Tracy West, Book 1
Appendix D-2 - Volume 1A: Track Alignment Tracy West, Book 2
Appendix D-3 - Volume 1B: Track Alignment Tracy East
Appendix D-4 – Volume 2: Structures
Appendix D-5 – Volume 3: Roadways
Appendix D-6 – Volume 4: Utilities
Appendix D-7 – Volume 5: Stations
Appendix D-8 – Volume 6: Right-of-Way
Appendix E – ACEforward Revised Ridership, Revenue, and Benefits Report
Appendix F – ACEforward Opinion of Probable Cost Report
Appendix G – Operating and Maintenance Cost for ACEforward Technical Memorandum
Appendix H – Regional Plans and Local General Plans
Appendix I – Supporting Aesthetics Information
Appendix J – Supporting Agricultural Resources Information
Appendix K – Air Quality, Greenhouse Gas, and Health Risk Assessment Supporting Documentation
Appendix L – Supporting Biological Resources Information
Appendix M-1 – ACEforward Archeological Survey Report
Appendix M-2 - ACE
forward
Historical Resources Inventory and Evaluation Report
Appendix N - Supporting Geology, Soils, Seismicity, and Paleontological Information
Appendix O - Supporting Hydrology and Water Quality Information
Appendix P - Supporting Transportation and Traffic Information
Appendix Q - Public and Agency Coordination
949 E. Channel St.,
Stockton, CA 95202
1-800-411-RAIL (7245)
Website design by
Michael Baker International
ACE Rail - Altamont Corridor Express