ACE Extension Lathrop to Ceres/Merced Notice of Preparation (NOP)

Notice of Preparation

ACE Extension Lathrop to Ceres/Merced Notice of Availability (NOA)

Notice of Availability

Individual Sections

(Figures are located at the end of each section)
Cover Page

Title Page

Executive Summary

Table of Contents

1.0 Introduction

2.0 Description of Phase I Improvements

3.0 Description of Phase II Improvements

4.0 Environmental Impact Analysis

4.1 Aesthetics

4.2 Agricultural Resources

4.3 Air Quality

4.4 Biological Resources

4.5 Cultural Resources

4.6 Energy

4.7 Geology and Soils

4.8 Greenhouse Gas Emissions

4.9 Hazardous Materials

4.10 Hydrology and Water Quality

4.11 Land Use and Planning

4.12 Noise and Vibration

4.13 Population and Housing

4.14 Public Services

4.15 Recreation

4.16 Safety and Security

4.17 Transportation and Traffic

4.18 Utilities and Service Systems

5.0 Other CEQA-Required Analysis

6.0 Alternatives

7.0 Public and Agency Involvement

8.0 List of Preparers

9.0 References

DEIR Appendix

Appendix A – Scoping Memo

Appendix B – Environmental Footprint

Appendix C – Preliminary Engineering Plans

Appendix D-1 – Core Capacity Memorandum

Appendix D-2 – Ridership, Revenue and Benefits Report

Appendix E – Opinion of Probable Cost Report

Appendix F – Operating and Maintenance Cost Technical Memorandum

Appendix G – Regional Plans and Local General Plans

Appendix H – Supporting Aesthetics Information

Appendix I – Supporting Agricultural Resources Information

Appendix J - Air Quality, Greenhouse Gas, and Health Risk Assessment Supporting Documentation

Appendix K – Supporting Biological Resources Information

Appendix L-1 – Archaeological Inventory Report

Appendix L-2 – Historical Resources Inventory and Evaluation Report

Appendix M – Supporting Geology, Soils, Seismicity, and Paleontological Information

Appendix N – Dam Inundation Maps

Appendix O – Supporting Transportation and Traffic Information

Appendix P – Public and Agency Coordination